Marshall Ford-Lago Vista 138kV Transmission Line Construction Project
Type: Transmission, Water Crossing
Scope: Performed a 14.5 mile 138kV transmission line upgrade including a 1.3 mile crossing over Lake Travis.
Location: Austin, Texas
Client: Lower Colorado River Authority
In March 2016, Irby Construction was contracted by the Lower Colorado River Authority (“LCRA”) to perform the Marshall Ford to Lago Vista 138kV Transmission Line Construction Project. The project scope included the replacement of a 1.3 mile transmission line across Lake Travis plus the upgrade of an existing 14.5 mile transmission line (69kV to 138kV).
Irby Construction successfully completed this project in April of 2016 to schedule and budget.
To learn more about this project, click here.
Start Date: March 2016
Completion Date: April 2016